School Name | Suburb | Description | Approved Project Cost | Grant Amount | School Contribution |
---|---|---|---|---|---|
Blakes Crossing Christian College | BLAKEVIEW SA 5114 | Construction of 3 secondary GLAs, science Lab, science prep & store, amenities, verandah & walkways | 1,850,800 | 435,250 | 1,415,550 |
Crossways Lutheran School | CEDUNA SA 5690 | Refurbishment of middle school classrooms and storerooms to provide science laboratory and prep room. | 460,680 | 328,230 | 132,450 |
Golden Grove Lutheran Primary School | WYNN VALE SA 5127 | Demolition of old toilets in existing building and refurbishment of adjacent GLAs to increase space. Refurbishment of neighbouring GLAs to improve access to, and utilisation of, breakout area. Doors to enclose breezeway between these buildings to provide additional breakout area. | 239,900 | 38,400 | 201,500 |
Maitland Lutheran School | MAITLAND SA 5573 | Refurbishment of administration facility and student toilets including new roof, extended staff room and additional meeting room. Construction of GLA for junior primary classes. | 800,020 | 284,760 | 515,260 |
Navigator College | PORT LINCOLN SA 5606 | Construction of multi purpose hall for a full size basketball court, GLA and teacher prep, storeroom, student amenities. | 3,685,010 | 650,640 | 3,034,370 |
Pinnacle College | ELIZABETH EAST SA 5112 | Construction of extension to multi purpose hall, with changerooms, toilets and stage. | 1,310,000 | 855,000 | 455,000 |
Prescott School, Northern | PARA VISTA SA 5093 | Construction of a covered outdoor learning area, for later enclosing as gym. | 415,000 | 119,000 | 296,000 |
Suneden Special School | MITCHELL PARK SA 5043 | Relocation of bus zone. Refurbishment of GLAs, shared learning areas and student amenities. Construction of covered outdoor learning areas | 1,338,400 | 767,910 | 570,490 |
Sunrise Christian School, Whyalla | WHYALLA NORRIE SA 5608 | Construction of Resource Centre, including library and learning support spaces | 430,940 | 100,000 | 330,940 |
Sunrise Christian School, Paradise | PARADISE SA 5075 | Construction of covered outdoor learning area | 239,000 | 102,420 | 136,580 |
Tatachilla Lutheran College | MCLAREN VALE SA 5171 | Construction of primary GLA, construction technology classroom, store, staff rooms and outdoor learning space | 1,213,000 | 500,000 | 713,000 |
The Hills Montessori School | ALDGATE SA 5154 | Construction of outdoor learning area for primary, with minor refurbishment to existing classrooms. | 174,400 | 109,400 | 65,000 |
Trinity College, Gawler River | EVANSTON GARDENS SA 5116 | Construction of 4 x GLAs, double GLA with wet area, student amenities. | 1,400,000 | 275,000 | 1,125,000 |
Tyndale Christian School, Murray Bridge | MURRAY BRIDGE SA 5253 | Construction of 2 x GLAs for junior primary and student amenities | 782,900 | 405,000 | 377,900 |
Unity College Murrraylands | MURRAY BRIDGE SA 5253 | Removal of asbestos in primary school student toilets and replace cubicle dividers. | 49,230 | 35,000 | 14,230 |
TOTAL | $14,389,280 | $5,006,010 | $9,383,270 |
School Name | Suburb | Project Description | Approved Project Cost | Grant Amount | School Contribution |
---|---|---|---|---|---|
Blakes Crossing Christian College | BLAKEVIEW SA 5114 | Construction of 2 storey building for food technology, dance & drama, 3 x GLAs, student amenities. Fit out of student amenities in existing building. | $2,072,900 | $655,000 | $1,417,900 |
Calvary Lutheran Primary School | MORPHETT VALE SA 5162 | Refurbishment of 2 GLAs and upgrade of adjacent passageway to learning common. Construction of a verandah. | $1,125,000 | $630,000 | $495,000 |
Encounter Lutheran College | VICTOR HARBOR SA 5211 | Construction of Senior School Centre with 7 x GLAs, learning commons, administration offices, staff room and offices, access road. Refurbishment of old administration area for student services. | $6,530,300 | $530,000 | $6,000,300 |
Emmaus Christian College | SOUTH PLYMPTON SA 5038 | Installation of fire sprinkler system in 2nd floor ceiling of old building to comply with local government directive | $270,910 | $30,000 | $240,910 |
Golden Grove Lutheran Primary School | WYNN VALE SA 5127 | Construction of 1 x GLA and adjoining Learning Street. Extension of existing building to create internal breakout between existing GLAs. Refurbishment of existing GLAs. | $563,300 | $270,000 | $293,300 |
Good Shepherd Lutheran Angaston | ANGASTON SA 5353 | Refurbishment of 2 x Junior Primary GLAs and adjacent parent entrance and student amenities. | $319,300 | $215,000 | $104,300 |
Horizon Christian School | BALAKLAVA SA 5461 | Construction of new Technology Studies Centre including large projects area and store. Extension of existing home economics space with additional textiles space. Enlargment of adjacent hall foyer. | $1,265,100 | $555,000 | $710,100 |
Pilgrim School | ABERFOYLE PARK SA 5159 | Refurbishment of existing staff room and adjoining GLA to provide teacher preparation area, resource storage and print room. | $358,200 | $105,000 | $253,200 |
Prescott School, Northern | PARA VISTA SA 5093 | Construction of 3 x GLAs with learning preparation area, verandah, and site works. | $926,400 | $540,000 | $386,400 |
Rivergum Christian College | GLOSSOP SA 5344 | Refurbishment of art room to also provide middle school science. Construction of science store. | $209,000 | $105,000 | $104,000 |
Sunrise Christian College, Naracoorte Campus | NARACOORTE SA 5271 | Construction of new resource centre and multipurpose art/drama space with office/tutorial rooms, with covered walkways to adjoining buildings | $627,300 | $280,000 | $347,300 |
Tatachilla Lutheran College | MCLAREN VALE SA 5171 | Extension of existing reception building to provide extra GLA, learning common, and large verandah. Refurbishment of existing building to rationalise space & relocate student amenities. | $855,000 | $180,000 | $675,000 |
Temple Christian College, Bethany Campus | PARALOWIE SA 5108 | Construction of COLA over existing double basketball courts | $826,500 | $405,000 | $421,500 |
Willunga Waldorf School | WILLUNGA SA 5172 | Construction of Stage 1 Senior School over sloping ground. 5 x GLAs, learning common, group study and amenities. Undercroft for future storage. Relocation of transportable GLA. | $2,359,700 | $655,000 | $1,704,700 |
TOTAL | $18,308,910 | $5,155,000 | $13,153,910 |
School Name | Suburb | Description | Approved Project Cost | Grant | School |
---|---|---|---|---|---|
Bethany Christian School | SALISBURY DOWNS SA 5108 | Construction of nine general learning areas, Information Technology Suite and two learning support areas, two open multipurpose areas, two offices and covered walkways | 6,843,500 | 150,000 | 6,693,500 |
Endeavour College | MAWSON LAKES SA 5095 | Refurbishment of existing technology studies and food studies. Construction of uniform shop and student lobby. Construction of second storey including eight general learning areas, learning common, five tutorial rooms and staff offices. | 7,264,000 | 275,000 | 6,989,000 |
Faith Lutheran College | TANUNDA SA 5352 | Refurbishment of two science and technology classrooms and purchase of furniture and equipment | 300,000 | 150,000 | 150,000 |
Heritage College | OAKDEN SA 5086 | Construction of three general learning areas. Refurbishment of two general learning areas and student amenities. | 1,263,200 | 360,000 | 903,200 |
IQRA College | O'HALLORAN HILL SA 5158 | Refurbishment of nine existing general learning areas, with upgraded furniture, building services and teaching technology. Refurbishment of two existing science laboratories including new benches, building services and teaching technology. | 427,000 | 389,300 | 37,700 |
IQRA College | O'HALLORAN HILL SA 5158 | Refurbishment of part of upper level of a building to include library and computer resource area. | 205,000 | 104,500 | 100,500 |
Mount Barker Waldorf School | MOUNT BARKER SA 5251 | Refurbishment of Senior and Middle School science building. | 819,800 | 702,000 | 117,800 |
Pinnacle College | ELIZABETH EAST SA 5112 | Refurbishment of existing multi-purpose hall to add student change rooms and student amenities. Construction of resource centre on first floor with lift. | 1,213,800 | 548,000 | 665,800 |
St George College | MILE END SA 5031 | Refurbishment of existing building for senior secondary including staff facilities and small kitchen for students. | 530,500.00 | 406,700.00 | 123,800 |
St Martins Lutheran College | MOUNT GAMBIER SA 5290 | Construction of a two storey building comprising food and hospitality centre, three art rooms, learning common and exhibition space, teacher office and storage area. | 4,466,620.00 | 941,100.00 | 3,525,520 |
Temple Christian College, Bethany Campus | PARALOWIE SA 5108 | Construction of a two storey building comprising six general learning areas, two flexible learning spaces, amenities, staff preparation area and storage. | 3,768,320.00 | 709,000.00 | 3,059,320 |
Tyndale Christian School, Murray Bridge | MURRAY BRIDGE SA 5253 | Construction of a Year 2 and Year 3 building to create three general learning areas, a resource centre, and an outdoor learning space. | 990,000.00 | 605,000.00 | 385,000 |
Vineyard Lutheran School | CLARE SA 5453 | Construction of two general learning areas with adjoining covered deck for outdoor learning, and student amenities. | 731,000.00 | 270,000.00 | 461,000 |
TOTALS | 28,822,740 | 5,610,600 | 23,212,140 |
School Name | Suburb | Project Description | Approved Project Cost | Grant | School | |||
---|---|---|---|---|---|---|---|---|
Faith Lutheran College | TANUNDA SA 5352 | Refurbishment of two mathematics classrooms, one wet science laboratory, and one science preparation room. | 527,000.00 | 175,000.00 | 352,000.00 | |||
Good Shepherd Lutheran School | ANGASTON SA 5353 | Refurbishment of three upper primary general learning areas and adjacent learning common to provide interactive learning spaces with new furniture. Construction of a covered outdoor learning area attached to the three classrooms. | 614,000.00 | 587,000.00 | 27,000.00 | |||
Immanuel Lutheran School | GAWLER SA 5118 | Refurbishment of existing six small classrooms to create four open concept classrooms with connected breakout spaces. | 765,000.00 | 306,000.00 | 459,000.00 | |||
IQRA College | O'HALLORAN HILL SA 5158 | Refurbishment of six classrooms for junior primary. | 294,000.00 | 250,000.00 | 44,000.00 | |||
IQRA College | O'HALLORAN HILL SA 5158 | Refurbishment of existing adult amenities to provide primary and secondary student amenities and staff amenities. | 279,000.00 | 219,000.00 | 60,000.00 | |||
IQRA College | O'HALLORAN HILL SA 5158 | Refurbishment of existing building to provide home economics facility comprising classroom, demonstration area, hospitality demonstration areas, storage and refrigeration facilities, joinery and equipment. | 146,000.00 | 116,000.00 | 30,000.00 | |||
King's Baptist Grammar School | WYNN VALE SA 5127 | Construction of the first stage of middle school building with classrooms, breakout spaces, teacher and administration offices. | 3,675,000.00 | 337,000.00 | 3,338,000.00 | |||
Maitland Lutheran School | MAITLAND SA 5573 | Construction of an upper primary building to replace existing transportables and provide six general learning areas around a learning common and a staff preparation space. | 2,200,000.00 | 685,000.00 | 1,515,000.00 | |||
Mount Barker Waldorf School | MOUNT BARKER SA 5251 | Refurbishment and extension of existing arts building. | 994,900.00 | 694,120.00 | 300,780.00 | |||
Navigator College | PORT LINCOLN SA 5606 | Construction of middle and senior school Stage 2 comprising science laboratories, art room, design and technology spaces, general learning areas, external stage and walkway. Refurbishment of student services area. | 3,495,000.00 | 930,000.00 | 2,565,000.00 | |||
Playford College | ELIZABETH SA 5112 | Construction of Stage 1 of specialist secondary areas to provide Science laboratory and store, home economics and store, art, breakout room and temporary outdoor learning verandah. | 2,267,500.00 | 999,000.00 | 1,268,500.00 | |||
Rivergum Christian College | GLOSSOP SA 5344 | Construction of a new building comprising a home economics facility, a classroom for secondary technology studies and student amenities. Construction of covered outdoor learning area over courts and hard roof to student area. | 1,000,000.00 | 223,100.00 | 776,900.00 | |||
The Hills Montesori School, Wairoa | STIRLING SA 5152 | Construction of extension to, and refurbishment of, existing middle school building to provide specific classrooms, new indoor learning spaces, specialised learning spaces, a teacher preparation space and new furniture. | 588,000.00 | 201,300.00 | 386,700.00 | |||
Tyndale Christian School, Murray Bridge | MURRAY BRIDGE SA 5253 | Construction of two general learning areas, two withdrawal and tuition rooms, staff and student amenities, and wide verandahs for outdoor learning and shade. | 679,200.00 | 339,200.00 | 340,000.00 | |||
17,524,600.00 | 6,061,720.00 | 11,462,880.00 |
School Name | Suburb | Project Description | Approved Project Cost | Grant | School |
---|---|---|---|---|---|
Faith Lutheran College | TANUNDA SA 5352 | Refurbishment of science, technology, engineering and mathematics laboratory to current standards and creation of tutorial room. | 336,000.00 | 105,000.00 | 231,000.00 |
IQRA College | O'HALLORAN HILL SA 5158 | Part refurbishment of existing building to provide two courts with appropriate flooring and lighting, two classrooms, student amenities, change rooms and enlarged foyer area. | 1,551,000.00 | 900,000.00 | 651,000.00 |
Pinnacle College, Golden Grove | GOLDEN GROVE SA 5125 | Construction of a two storey building for secondary students comprising a science laboratory, home economics room, technology room, art room, language room, special needs room and staff offices. | 3,984,800.00 | 505,000.00 | 3,479,800.00 |
Playford College | ELIZABETH SA 5112 | Construction of seven classrooms as the first floor of the western wing, with breakout areas on both ground and first floors. | 2,877,300.00 | 774,000.00 | 2,103,300.00 |
Prescott College Southern | MORPHETT VALE SA 5162 | Construction of Stage 1 of a multi-purpose hall providing two courts, for both primary and secondary use. | 5,048,000.00 | 725,000.00 | 4,323,000.00 |
Southern Montessori School | O'SULLIVAN BEACH SA 5166 | Construction of extra two classrooms by extending two existing classrooms and installation of partitioning. Refurbishment of resulting four classrooms. | 1,074,500.00 | 625,000.00 | 449,500.00 |
Suneden Specialist School | MITCHELL PARK SA 5043 | Refurbishment and relocation of two classrooms, specialist areas and student amenities. Construction of a multi-purpose room, two outdoor learning areas, student amenities and expansion of mangement and specialist staff administration areas. | 3,687,000.00 | 360,000.00 | 3,327,000.00 |
Sunrise Christian School, Marion | MARION SA 5043 | Construction of cover over existing play area. | 550,000.00 | 450,000.00 | 100,000.00 |
Sunrise Christian School, Marion | MARION SA 5043 | Construction of a lift in an existing two level building. | 350,000.00 | 275,000.00 | 75,000.00 |
Sunrise Christian School, Whyalla | WHYALLA NORRIE SA 5608 | Purchase of a modular building to provide four classrooms, staffroom, staff amenities, school reception, administration offices and sick bay. | 2,000,000.00 | 700,000.00 | 1,300,000.00 |
Tyndale Christian School, Salisbury East | SALISBURY EAST SA 5109 | Construction of two general learning areas with attached withdrawal room for Year 1 students. | 794,830.00 | 100,000.00 | 694,830.00 |
Waikerie Lutheran Primary School | WAIKERIE SA 5330 | Refurbishment of existing rooms to create a double classroom learning studio for Year 5 and Year 6. Construction of attached covered outdoor learning area. | 534,000.00 | 464,200.00 | 69,800.00 |
Woodcroft College | MORPHETT VALE SA 5162 | Construction of new two storey primary school to replace ageing transportable buildings. | 12,920,000.00 | 420,000.00 | 12,500,000.00 |
35,707,430.00 | 6,403,200.00 | 29,304,230.00 |
School Name | Suburb | Project Description | Approved Project Cost | Grant | School |
---|---|---|---|---|---|
Playford College | ELIZABETH SA 5112 | Construction of ground floor facility to provide art, information and communication technology, media and design and technology facilities, breakout spaces, a meeting room, storage and student amenities. | 3,042,340.00 | 340,000.00 | 2,702,340.00 |
Maitland Lutheran School | MAITLAND SA 5573 | Construction of a senior school centre comprising four classrooms, science laboratory, learning common, staff preparation, staff offices and staff and student amenities. | 2,848,092.00 | 300,000.00 | 2,548,092.00 |
St George College | MILE END SA 5031 | Construction of a new canteen. | 498,217.00 | 250,000.00 | 248,217.00 |
Sunrise Christian School, Fullarton | FULLARTON SA 5063 | Construction of a covered outdoor learning area (COLA) over existing hardcourt and a canopy over a new seating area. | 842,000.00 | 450,000.00 | 392,000.00 |
The Hills Christian Community School | VERDUN, SA 5245 | Construction of a junior secondary school for Year 7 and 8 to create four general learning areas (GLA), a breakout space, a staff office, two meeting rooms, landscaping, paving, decking and air conditioning. | 3,340,894.00 | 828,000.00 | 2,512,894.00 |
Tyndale Christian School, Murray Bridge | MURRAY BRIDGE SA 5253 | Construction of junior primary facility comprising two general learning areas (GLA), consulting and counselling rooms, staff offices, storage, sensory rooms, a meeting room, withdrawal rooms, a laundry, staff and student amenities and a covered outdoor learning area (COLA). | 1,655,669.00 | 764,000.00 | 891,669.00 |
Torrens Valley Christian School | HOPE VALLEY SA 5090 | Construction of a two storey building for primary students comprising 15 classrooms, a science, technology, engineering and mathematics (STEM) room, a music room, breakout spaces and learning commons, staff offices, staff and student amenities, a canteen, landscaping, a nature play area, access and pathways and additional parking. | 10,048,124.00 | 808,000.00 | 9,240,124.00 |
Southern Montessori School | O'SULLIVAN BEACH SA 5166 | Refurbishment and reconfiguration of current layout to create two general learning areas (GLA). Refurbishment of the library, reception and administration area. Construction of a meeting room and installation of a lift. | 1,701,700.00 | 364,000.00 | 1,337,700.00 |
Temple Christian College, Mile End | MILE END SA 5031 | Refurbishment of existing building to create an art and textile studio comprising two art rooms, a textile room, a tutorial room and break out spaces, a food studies facility comprising a junior and senior kitchen with adjoining verandah, a cool room, a freezer room, storerooms and a staff office. Construction of an extension to existing building comprising a laundry and staff and student amenities. | 2,994,980.00 | 585,000.00 | 2,409,980.00 |
Loxton Lutheran School | LOXTON SA 5333 | Construction of four general learning areas (GLA), a learning common, a breakout space, withdrawal rooms, a staff office, verandahs, landscaping and paving. | 2,528,760.00 | 621,000.00 | 1,907,760.00 |
Good Shepherd Lutheran School Angaston | ANGASTON SA 5353 | Refurbishment of two general learning areas (GLA) and a counsellor's office. Construction of a deck to provide a covered outdoor learning area (COLA) and nature play. | 752,550.00 | 231,000.00 | 521,550.00 |
St Jakobi Lutheran School | LYNDOCH SA 5351 | Construction of two general learning areas (GLA) and music and language rooms, a covered outdoor deck and verandahs for transit. | 1, 083,550.00 | 274,000.00 | 809,550.00 |
TOTAL | $31,336,876.00 | $5,815,000.00 | $25,521,876.00 |
School Name | Suburb | Project Description | Approved Project Cost | Grant | School |
---|---|---|---|---|---|
Golden Grove Lutheran Primary School | Wynn Vale, SA 5127 | Construction of general learning area, student amenities, platform lift, bag gallery and breakout space comprising a theatrette, library, wet area and outdoor deck. | 1,080,716.00 | 474,000.00 | 606,716.00 |
Loxton Lutheran School | Loxton, SA 5333 | Refurbishment of existing library to a student support hub comprising a multipurpose space, learning space, sensory room, withdrawal room, staff offices and storage. | 415,000.00 | 203,100.00 | 211,900.00 |
Mount Barker Waldorf School | Mount Barker, SA 5251 | Refurbishment of existing building comprising a general learning areas, student support room, Information Technology area, teacher preparation area, access ramp and landing. | 685,000.00 | 291,800.00 | 393,200.00 |
Ngutu College | Woodville North, SA 5012 | Refurbishment of existing building into science laboratory comprising teacher preparation areas, three specialist studios, four general learning areas, student lounge, two teacher offices, breakout space, lockers, storage and technical studies area comprising metal work room, woodwork room, spray booth and storage | 3,746,456.00 | 616,388.00 | 3,130,068.00 |
Playford College | Elizabeth, SA 5112 | Construction of six general learning areas, breakout space and staff preparation area | 2,091,680.00 | 827,200.00 | 1,264,480.00 |
Portside Christian College | New Port, SA 5015 | Construction of three story senior hub comprising eight classrooms, three specialist classrooms, breakout space, staff preparation space and amenities. | 9,435,925.00 | 1,000,000.00 | 8,435,925.00 |
Prescott College | Prospect, SA 2148 | Refurbishment and extension of existing library comprising of seminar room, remote learning alcove, learning hive and storage | 576,899.00 | 237,400.00 | 339,499.00 |
Sunrise Christian School Morphett Vale | Morphett Vale, SA 5162 | Construction of covered outdoor learning area over existing basketball court and storage shed | 900,000.00 | 469,800.00 | 430,200.00 |
Sunrise Christian School, Whyalla | Whyall Norrie, SA 5068 | Construction of three general learning areas, two small group learning rooms, media room, a multipurpose performance and art space, store rooms and student amenities | 2,500,000.00 | 927,100.00 | 1,572,900.00 |
Temple Christian College | Mile End, SA 5031 | Alteration to the size of an existing building to facilitate the construction of a covered outdoor learning area over existing court and refurbishment of surface. Refurbishment of the existing building to include a design, technology and engineering learning area and a kitchenette | 2,090,741.00 | 1,000,000.00 | 1,090,741.00 |
Torrens Valley Christian School | Hope Valley, SA 5090 | Construction of outdoor multipurpose hard play court | 394,665.00 | 154,400.00 | 240,265.00 |
Tyndale Christian School, Murray Bridge | Murray Bridge, SA 5253 | Construction of a Wellbeing Hub comprising of seven offices, two meeting rooms, storage, withdrawal room and amenities. | 1,181,000.00 | 884,000.00 | 297,000.00 |
Tyndale Christian Schhol, Stathalbyn | Strathalbyn, SA 5255 | Refurbishment of existing building into a interactive resource centre including information technology service and student help desk. Refurbishment of existing kitchen to include a hospitality and home economics classroom for secondary students | 1,152,000.00 | 595,000.00 | 557,000.00 |
TOTAL | $26,250,082.00 | $7,680,188.00 | $18,569,894.00 |
School Name | Suburb | Project Description | Approved Project Cost | Grant | School |
---|---|---|---|---|---|
Harvest Christian College | KADINA | Refurbishment and extension of library comprising study areas, storage, teaching space and staff preparation area. | 1,134,218.00 | 895,000.00 | 239,218.00 |
Hope Christian College | CRAIGMORE | Construction of an innovation hub comprising science, chemistry and biology laboratory, woodwork, metal work, art room, digital design, robotics, laboratory and teacher preparation areas, storage, staff office, student amenities, break-out space and elevator. | 9,170,547.00 | 1,000,000.00 | 8,170,547.00 |
King's Baptist Grammar School | WYNN VALE | Refurbishment of two buildings comprising general learning areas, break out spaces, staff offices and student amenities for Years 10 and 11. | 2,168,414.00 | 480,000.00 | 1,688,414.00 |
Mid North Christian College | PORT PIRIE | Construction of student amenities block comprising 6 individual amenities. | 143,000.00 | 84,000.00 | 59,000.00 |
Southern Montessori School | O'SULLIVAN BEACH | Refurbishment of student and staff amenities. Construction of verandah and facade to create under cover learning space. | 833,843.00 | 745,000.00 | 88,843.00 |
St Jakobi Lutheran School | LYNDOCH | Demolition of transportable buildings. Construction of two general learning areas, breakout areas and verandah. | 1,321,877.00 | 585,000 | 736,877.00 |
St Martins Lutheran College | MOUNT GAMBIER | Refurbishment and construction of Senior School Centre comprising Learning Enrichment & Wellbeing spaces, general learning areas, flexible learning areas, student and staff amenities, staff offices and pod, student reception, sick room, and storage. | 10,108,450.00 | 1,000,000.00 | 9,108,450.00 |
Tyndale Christian School Murray Bridge | MURRAY BRIDGE | Refurbishment of student amenities comprising 10 individual amenities and disabled access. Construction of a general learning area for Year 10. | 609,960.00 | 494,250.00 | 115,710.00 |
Tyndale Christian School Strathalbyn | STRATHALBYN | Construction of three general learning areas, staff office and covered outdoor learning area. | 1,129,005.00 | 805,000.00 | 324,005.00 |
Willunga Waldorf School | WILLUNGA | Construction of two general learning areas, storage room and covered outdoor learning area | 1,056,880.00 | 580,000 | 476,880.00 |
TOTAL | $27,676,194.00 | $6,668,250.00 | $21,007,944.00 |